Public Works is beginning work on the HAWK Intersection Improvements at Five Location Project. Construction is anticipated to commence on June 2, 2025 and end on September 8, 2025.

The Project involves work to enhance pedestrian safety at five unsignalized intersections by installing High-Intensity Activated Crosswalk (HAWK) beacons, construction of ADA curb ramps, removing and replacing curb, gutter, sidewalk; hot-mix asphalt paving; installation of pedestrian barricades; and lowering and raising of existing utilities.


Locations included are as follows:

Broadway Street / Hampshire Street

Broadway Street / Illinois Street

Springs Road / Lassen Street / Hilton Avenue

Springs Road / Tregaskis Avenue

Springs Road / Heartwood Avenue


Questions regarding the project can be directed to: farrah.lim@cityofvallejo.net or 707-645-2627